Enter your keyword

CITY OF LYNWOOD

portfolio
About The Project

LONG BEACH BOULEVARD STREET IMPROVEMENTS PHASES I & II

Infrastructure Engineers provided construction management, inspection, and labor compliance for this project that involved two miles roadway resurfacing and median improvements. Concrete improvements included sidewalk, driveway approaches, cross gutters, curb and gutter, curb ramps, installation of 16 detectable warning surfaces on existing curb ramps, and construction of six new bus pads. Other improvements include:

•  Twenty tree removals
•  Replacement of five fire hydrants and installation of three water service connections
•  Installation of four Filterra units
•  Construction of landscaping improvements on median islands with irrigation systems and a city monument sign
•  Relocation of an existing street lights, traffic signal improvements at two intersections, installation of 22 signal loop detectors and     associated traffic striping, markings and curb painting

error: Content is protected !!